Warby Views Estate, Wangaratta Stages 1 to 6
146 lot residential subdivision development constructed over multiple stages.
Works include:
– bulk earthworks with sections of level 1 supervised fill
– drainage and service installation including storm water retention basins and sewer to depths of 6m +
– a pump station and two 27m long x 3m diameter sewer detention tanks
– concrete kerb, footpath and road construction